A private working desk for the questions, documents, and conditions worth understanding before a lease, purchase, or project kickoff.

Read this first

Project Desk helps frame questions; it does not determine zoning, code compliance, legal rights, environmental conditions, engineering capacity, cost, or property suitability. Verify conclusions with the appropriate professionals before making a commitment.

Property file

One property. One working brief.

Use plain language. If something is unknown, leave it open—the checklist is designed to make those gaps visible.

Readiness review

Make the unknowns visible.

Mark each prompt based on what you can support today. A concern is not necessarily a deal-breaker; it is a reason to investigate.

01

Property + transaction

Establish what is actually being offered—and what the agreement assumes.

0 / 4

Ownership and boundaries

Are the owner, lot boundaries, easements, shared drives, and areas included in the deal understood?

Review status for Ownership and boundaries

Agreement and contingencies

Does the lease or purchase agreement allow enough time for architectural, zoning, code, environmental, and financial review?

Review status for Agreement and contingencies

Occupancy expectations

Are the target possession, construction, approval, and move-in dates realistic and clearly distinguished?

Review status for Occupancy expectations

Landlord / seller scope

Is responsibility for existing violations, repairs, utilities, base-building work, and approvals stated clearly?

Review status for Landlord / seller scope
02

Use + approvals

A building can look suitable while its legal use tells a different story.

0 / 4

Existing legal use

Do available certificates, approvals, and municipal records agree with how the building is currently used?

Review status for Existing legal use

Proposed use

Has the intended use—including accessory operations, storage, production, assembly, or outdoor activity—been described precisely?

Review status for Proposed use

Zoning path

Has a qualified professional reviewed use, bulk, parking, loading, signage, and the likely municipal approval path?

Review status for Zoning path

Prior approvals and conditions

Have resolutions, variances, site plans, permits, open applications, and conditions tied to the property been gathered?

Review status for Prior approvals and conditions
03

Access + life safety

Test the route from the property line to every place people need to reach.

0 / 4

Exits and egress

Are the number, location, width, travel distance, discharge, and condition of exits appropriate for the proposed occupancy?

Review status for Exits and egress

Accessibility

Is there an accessible route through parking, entrances, occupied spaces, toilet rooms, and required site amenities?

Review status for Accessibility

Fire protection

Are sprinkler, alarm, fire separation, suppression, and fire-department access needs understood for the proposed use?

Review status for Fire protection

People and operations

Have occupant count, visitors, shifts, deliveries, vehicles, equipment, hazardous materials, and emergency procedures been considered?

Review status for People and operations
04

Building + site

Look beyond finishes to the systems and conditions that determine real project scope.

0 / 4

Structure and capacity

Are floor loads, roof loads, clear heights, framing modifications, settlement, and visible deterioration compatible with the plan?

Review status for Structure and capacity

Roof and envelope

Are roof age, active leaks, drainage, walls, windows, insulation, and air or water infiltration documented?

Review status for Roof and envelope

Site circulation

Can cars, trucks, loading, refuse, pedestrians, emergency vehicles, snow, and deliveries coexist safely?

Review status for Site circulation

Environmental conditions

Have prior uses and possible asbestos, lead, tanks, contamination, wetlands, flood, or other environmental constraints been investigated?

Review status for Environmental conditions
05

Systems + delivery

Confirm that the building can support the use—and that the project can support the business plan.

0 / 4

Utilities and services

Are electrical, gas, water, sewer, stormwater, data, and fire-service capacity and upgrade lead times known?

Review status for Utilities and services

Mechanical performance

Are heating, cooling, ventilation, exhaust, process, humidity, noise, and equipment-replacement needs understood?

Review status for Mechanical performance

Scope and cost

Does the working budget include professional services, approvals, testing, construction, contingencies, equipment, and owner costs?

Review status for Scope and cost

Project team and sequence

Are the architect, engineers, attorney, broker, environmental consultant, contractor, and decision-makers engaged at the right time?

Review status for Project team and sequence

Document register

Gather the record—not just the listing.

Mark what you already have. The resulting summary will keep the remaining requests together for your broker, owner, attorney, and project team.

0of 10 gathered

Project notes

What could change the decision?

Record assumptions, conversations, deadlines, promised work, and anything that should be verified in writing.

Working summary

Take the right questions into the room.

BLAST / Project DeskWorking property brief

Property review

Untitled project

Property address not entered
Current use
Not entered
Intended use
Not entered
Target
Not entered
0%of prompts reviewed
0 confirmed0 questions0 concerns

Open questions + concerns

No open items recorded yet.

Documents still to gather

  • Current boundary and topographic survey
  • Existing architectural and engineering drawings
  • Certificate of occupancy or continued occupancy
  • Zoning approvals, resolutions, and approved site plans
  • Permit history, inspection records, and open violations
  • Title report, easements, deed restrictions, and shared agreements
  • Environmental reports and prior-use records
  • Property condition, roof, structural, and building-systems reports
  • Utility bills, capacities, service records, and equipment information
  • Draft lease, letter of intent, purchase agreement, or term sheet

Project notes

No general notes recorded.

This brief frames questions and organizes information. It is not a zoning, code, legal, environmental, engineering, cost, or property-condition determination. Verify all conclusions with qualified professionals before making a commitment.